Hepu Power Supply Company Production Dispatch Building Project

Project Name: Hepu Power Supply Company Production Dispatch Building Project (2011 - 2012, 30 million)
Progress phase: Preliminary design and construction period: 2011 - 2012 Major equipment: firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc.

Project Description:
The project is located at No. 52, Dinghai Road, Lianzhou Town, Hepu County, Guangxi Zhuang Autonomous Region. It covers an area of ​​1,000 square meters and a building area of ​​8,000 square meters.
The total investment of the project is RMB 30 million.

Construction Unit: Hepu Power Supply Company Postal address: No. 30, Huizhu Avenue, Lianzhou Town, Hepu County, Guangxi Zip Code: 536100
Contact: Du Gong Phone

4. Project Name: Golden Hulu Garden Residential Project 2011-04-15
Progress phase: Environmental impact assessment construction period: July 2011 - July 2014 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, construction facilities, etc.

Project Description:
The project is located in Zhuoying New District, Dewuming County, central and southern Guangxi Province. It is adjacent to No. 1 Road (Weiyi Road) of the Zhuying New District on the north, No. 3 Road (Jingwu Road) of the Zhuying New District on the south, and No. 10 Road of the Biaoying New District on the east. No. 6 of the new project zone is located in the south and passes through the residential area. The project site is roughly square, about 326 meters long from east to west, and about 311 meters deep from north to south. The site is relatively flat, with abundant natural resources and good landscape. The project has a building area of ​​210,000 square meters and the land is divided into two blocks, namely North and South. There is No. 6 road in the No. 4 Division of Yingying New District divided into two. The total land area is approximately 100,000 square meters, the net land area is approximately 91,319 square meters, the total construction area is approximately 237,228.73 square meters, the floor area ratio is 2.3, the building density is 25.05%, and the greening rate is 35.05%. The project will be mainly residential, and it will also be equipped with commercial facilities such as shops, clubs, property management, and kindergartens. The project area is designed to provide 1608 households with various types of residential houses.
The total investment of the project is 400 million yuan.

Construction Unit: Wuming County Fuming City Investment Development Co., Ltd. Postal address: No. 245, Chengxingwu Avenue, Wuming County Post Code: 530100
Contact: Chen Gong Tel: 0771--5556624

Design institute: Coal Research Institute Hangzhou Environmental Protection Research Institute (EIA)
Postal address: No.288 Gongxiu Road, Xiaoshan District, Hangzhou, China: 311201
Contact: Wang Gong Tel: 0771-5842139
Fax: 0771-5842139

Related Developments: Tower Crane Infrastructure Project

Selective Laser Sintering

Selective Laser Sintering (SLS) was developed at the University of Texas in Austin, by Carl Deckard and colleagues. The technology was patented in 1989 and was originally sold by DTM Corporation. DTM was acquired by 3D Systems in 2001. The basic concept of SLS is similar to that of SLA. It uses a moving laser beam to trace and selectively sinter powdered polymer and/or metal composite materials into successive cross-sections of a three-dimensional part. As in all rapid prototyping processes, the parts are built upon a platform that adjusts in height equal to the thickness of the layer being built. Additional powder is deposited on top of each solidified layer and sintered. This powder is rolled onto the platform from a bin before building the layer. The powder is maintained at an elevated temperature so that it fuses easily upon exposure to the laser. Unlike SLA, special support structures are not required because the excess powder in each layer acts as a support to the part being built. With the metal composite material, the SLS process solidifies a polymer binder material around steel powder (100 micron diameter) one slice at a time, forming the part. The part is then placed in a furnace, at temperatures in excess of 900 °C, where the polymer binder is burned off and the part is infiltrated with bronze to improve its density. The burn-off and infiltration procedures typically take about one day, after which secondary machining and finishing is performed. Recent improvements in accuracy and resolution, and reduction in stair-stepping, have minimized the need for secondary machining and finishing.

The main material for the SLS are the metal part or Nylon material which are commonly used in the industry or consumer fields. contact us to do the business, we are your best partner from beginning to end to give you the best service.

IMG_0767

Selective Laser Sintering,Laser Sintering,Selective Laser Sintering 3D Printing,Laser Sintering Service

Suzhou FCE precision electronics Co., LTD , http://www.fcesz.com

Posted on